01 / FACTORY DESIGN CONSULTING
A factory designed right,
before the first brick.
Most production problems start on the drawing board. We design cosmetics plants around the products you will make, the volumes you expect and the regulations you must meet, with room to grow.
WHAT WE ASSESS
Start with the whole picture.
- Site and building: area, ceiling height, floor load; greenfield or existing
- Product mix and formats, now and in 3 to 5 years
- Target capacity per line and shift pattern
- Utilities: power, water quality, steam, compressed air and HVAC
- Regulatory targets: ISO 22716, local licence and export markets
- Budget split between building works and equipment
WHAT YOU RECEIVE
Decisions you can build on.
- Concept layout with material, personnel and waste flows
- Area schedule: square metres per zone
- Equipment list with capacities
- Utilities load summary
- GMP gap report for existing sites
- CAPEX estimate and implementation timeline
EXPLORE FACTORY CONSULTING
Five connected areas of expertise.
FACTORY DESIGN / 01
Concept Layouts & Material Flows
Site, product mix and movement planned together.
FACTORY DESIGN / 02
Area Schedules & Equipment Lists
Space and equipment matched to capacity.
FACTORY DESIGN / 03
Utilities & HVAC Concepts
Infrastructure planned around the manufacturing process.
FACTORY DESIGN / 04
GMP Gap Assessment
A clear assessment of an existing facility.
FACTORY DESIGN / 05
CAPEX & Implementation Planning
Building and equipment decisions brought into one plan.
GMP PRINCIPLES
Built into every layout.
- One-direction flow from receiving to dispatch
- Quarantine, released and rejected storage zones
- Dedicated weighing and dispensing room
- Segregated manufacturing, filling and packing
- QC laboratory with separated microbiology